Incomplete urban projects: urban voids in post-high speed train Zaragoza
Main Article Content
Abstract
The arrival of the high-speed train coincided with a boom in the property market and
expectations of economic growth throughout the country. The new infrastructure was
accompanied by a plethora of urban projects and real estate developments. This was the case
in Zaragoza, where the arrival of the new train service became a major instrument of urban development. However, many of these projected changes were dependent on development rights and the sale of former railway land, but the advent of the crisis paralysed these developments, leaving a desolate urban landscape.
Downloads
Download data is not yet available.
Article Details
How to Cite
Bellet Sanfeliu, C., & Alonso Logroño, M. P. (2016). Incomplete urban projects: urban voids in post-high speed train Zaragoza. Boletín De La Asociación Española De Geografía, (70). Retrieved from https://bage.age-geografia.es/ojs/index.php/bage/article/view/2239